The Tulum International Airport Terminal
Key facts about the Tulum Airport terminal: opening, operator, capacity, gates, runway and passenger numbers.
Tulum International Airport “Felipe Carrillo Puerto” opened on December 1, 2023. It is operated by Grupo Mundo Maya, the trade name of Grupo Aeroportuario, Ferroviario, de Servicios Auxiliares y Conexos Olmeca-Maya-Mexica, a Mexican state-owned company.
13
Departure gates
5.5 M
Annual passenger capacity
3,700 m
Runway length
500
Parking spaces
| Item | Value |
|---|---|
| IATA / ICAO code | TQO / MMTL |
| Opened | December 1, 2023 |
| Building | One two-level terminal |
| Runway | 12/30, 3,700 by 30 meters, concrete |
| Passengers in 2024 | 1,233,459 |
| Connection | Tulum Aeropuerto station of the Tren Maya |
See how services are laid out on the airport map.
More information for your trip
- Check-in times
- Buying tickets
- Airport fee (TUA)
- Customs and immigration
- Traveling with minors
- Traveling with pets
- Security checkpoint
- Baggage
- Lost and found
- Airport map
- Restaurants
- Shops
- VIP lounges
- Wi-Fi
- Currency exchange
- Banks and ATMs
- Accessibility
- Medical services
- Phone directory
- Private aviation
- Getting downtown
- Parking
- Car rental
- Nearby hotels