Photo: Oleg Yunakov, CC BY-SA 4.0, via Wikimedia Commons
Home / Passenger guide / The Tulum International Airport Terminal

The Tulum International Airport Terminal

Key facts about the Tulum Airport terminal: opening, operator, capacity, gates, runway and passenger numbers.

Tulum International Airport “Felipe Carrillo Puerto” opened on December 1, 2023. It is operated by Grupo Mundo Maya, the trade name of Grupo Aeroportuario, Ferroviario, de Servicios Auxiliares y Conexos Olmeca-Maya-Mexica, a Mexican state-owned company.

13

Departure gates

5.5 M

Annual passenger capacity

3,700 m

Runway length

500

Parking spaces

ItemValue
IATA / ICAO codeTQO / MMTL
OpenedDecember 1, 2023
BuildingOne two-level terminal
Runway12/30, 3,700 by 30 meters, concrete
Passengers in 20241,233,459
ConnectionTulum Aeropuerto station of the Tren Maya

See how services are laid out on the airport map.